Caruso Homes has submitted Applications for Voluntary Annexation and Map Amendment (Rezoning) for 51.78 acres located on Amazon Trail and Rolesville Road.
** These applications shall be reviewed under the Unified Development Ordinance (UDO), and not the Land Development Ordinance (LDO).
ANX 21-02 - Approved 11/04/2021. Voluntary Annexation Petition for contiguous 35.204 acres, being PIN 1767284304, and non-contiguous 14.713 acres, being PIN 1767284925, for a total of 51.78 acres into the incorporated Town limits.
- On 06-01-2021, the Town Board authorized the Town Clerk to Investigate Sufficiency of the Petition.
- On 07-08-2021, the Town Board set a public hearing for the petition.
- On 08-03-2021, the Town Board held a public hearing on the petition; the Board voted unanimously to continue the Public Hearing to October 5, 2021.
- On 10-05-2021, the Town Board voted unanimously to continue the public hearing to November 4, 2021.
- On 11-04-2021, the Town Board voted unanimously to Approve ANX 21-02.
The Annexation Ordinance A 21-__x__ was Recorded on ___dated_____ as BK______ / PG ________.
MA 21-05 - APPROVED 2021-12-07 -- Application for Map Amendment (aka Rezoning) to Rezone ___xxxx_ acres, being PIN ______ xxx _______, from the (Wake County) R-30 District to the R3-CZ (Conditional Zoning) District. Town Board of Commissioners approved this rezoning at their _12-07-2021_ meeting as part of Item B.2 (Consent agenda).
- On 10-05-2021, the Town Board voted unanimously to set the public hearing for MA 21-05 for 11-04-2021.
- On 10-25-2021, the Planning Board held a public hearing, and voted unanimously to Recommend Approval to the Town Board, suggesting conditions of: 1.) Applicant completely address TRC comments, and 2.) Construction shall not start until Rolesville Road is widened to three lanes.
- On 11-04-2021, the Town Board voted unanimously to Approve MA 21-05 with Conditions:
1.) all dwellings to be constructed on raised foundations with crawl spaces, no on-slab construction;
2.) development to incorporate a public greenway as shown on sketch plan incorporating option two, together with wayfinding signing and construction of a ten-foot, public multi-use path, connecting the greenway to the Kalas Falls greenway network as shown on the sketch plan;
3.) a solid board fence shall be erected along the property line boundary fronting the Eastern terminus of the greenway bordering the Shore property;
4.) on-site construction shall not commence until the Kalas Falls/Rolesville Road widening project is complete.
- On 12-07-2021, the Town Board voted unanimously to Approve a Revised Sketch Plan incorporating the Conditions that are part of the Approval on 11-04-2021.
PR 22-01 - APPROVED 2024-11-19 - Preliminary Subdivision Plat to subdivide 51.78 acres into 82 Single-Farmily Detached residential lots, 8 open space lots, XXXX linear feet of new public streets (right-of-way), public greenway, and stormwater facilities. The subdivision will consist of Two (2) phases, each with 41 residential lots. Six (6) submittals of this application were reviewed by TRC Staff between January 2022 and November 2024.
CID-24-09 - UNDER REVIEW - Construction Infrastructure Drawings for residential subdivision improvements pursuant to Approved PR 22-01. V1 Plan set is 70 Sheets, dated 12-02-2024. V2 Plan set is 77 sheets, in 2 Parts: 40 Sheets, Cover - C-7.1 / 37 Sheets, C-8.0 - L3.
- 1st Submittal received 2024-12-02; on TRC Staff review during DECEMBER 2024; Comments published on 2025-01-06.
- 2nd Submittal received 2025-02-03; on TRC Staff review during FEBRUARY 2025; Comments published on 2025-03-09.
Updates
Town Board Public Hearing on Rezoning (MA 21-05)
Rezoning from Wake County's R-30 Zoning District (currently in TOR ETJ) to TOR Zoning District of R3-CZ (Conditional Zoning).
Documents
ANX 21-02 - Annexation Petition
MA 21-05 Hollingsworth/Moody Property Rezoning
MA 21-05 - Town Board Mtg held 11-04-2021
MA 21-05 - Town Board Mtg of 12-07-2021
PR 22-01 - Preliminary Subdivision Plat - 6th Submittal
PR 22-01 - Final Signed Approved Preliminary Subdivision Plat
CID-24-09 - Construction Infrastructure Drawings - V1
Wake Co Watershed Permits
CID-24-09 - Construction Infrastructure Drawings - V2
- V2 - Response to V1 comments
- V2 - SIA Report dated 2-3-25
- V2 - Geotech Report for SIA
- V2 - CID Plan set Part 1/2 - First 40/77 Sheets
- V2 - CID Plan set Part 2/2 - Last 37/77 Sheets
- V2 - Comments SUMMARY-READ FIRST
- V2 - Comments_ENGINEERING Memo dated 3-5-25
- V2 - Comments_ENGINEERING Markups Part 1 of 2
- V2 - Comments_ENGINEERING Markups Part 2 of 2
- V2 - Comments_ENGINEERING Markups on SIA Report