This webpage contains all the Development Applications that are currently Submitted and Under Review by the Town Technical Review Committee and/or Town Planning Board/Board of Commissioners (depending on the type of application). Once an Application achieves its final Approval, those records will be moved to the "Wallbrook - Approvals" webpage.
SDP-23-04 - UNDER REVIEW - Site Development Plan of Lot 11 of the Wallbrook commercial development for a 7-Eleven convenience store/gas station .
- 1st Submittal Received 05-01-23 - Comments published on 05/25/2023.
- 2nd Submittal received 06/01/2023; on TRC-STAFF review during JUNE 2023; Comments published on 06-23-2023.
- 3rd Submittal received 03/01/2024; on TRC-STAFF review during MARCH 2024; Comments published on 04-05-2024.
- Wake Co. Permit SEC-119905-2024/SWF-119905-2024 Disapproval dated 4-5-2024.
- 4th Submittal received 05/01/2024; on TRC-STAFF review during MAY 2024; Comments published on 06-09-2024.
- 5th Submittal received 09/13/2024; on TRC-STAFF review during OCTOBER 2024; Comments publised on 10-15-2024.
- Wake Co. Permit SEC-119905-2024/SWF-119905-2024 Disapproval dated 9-26-2024.
- Wake Co. Permit SEC-119905-2024/SWF-119905-2024 Disapproval dated 12-12-2024.
CID-23-04 - UNDER REVIEW - Construction Infrastructure Drawings for the (north/west side of S. Main Street) extension of Virginia Water Drive (as a cul-de-sac street).
- 1st Submittal Received 05-01-23 - Comments published on 05/25/2023.
- 2nd Submittal received 06/01/2023; on TRC-STAFF review during JUNE 2023; Comments published on 06/23/2023.
- 3rd Submittal received 03/01/2024; on TRC-STAFF review during MARCH 2024; Comments published on 04/06/2024.
- 4th Submittal received 05/02/2024; on TRC-STAFF review during MAY 2024; Comments published on 06/09/2024.
- 5th Submittal received 09/13/2024; on TRC-STAFF review during OCTOBER 2024; Comments published on 10/14/2024.
- Wake county Permit SEC-119903-2024 Letter of DISAPPROVAL dated 2024-12-12.
CID-24-02 - UNDER REVIEW - Construction Infrastructure Drawings for Lot 7, for mass grading and erosion control purposes. This application is submitted/reviewed/Approved under the Land Development Ordinance (LDO).
- 1st Submittal rcvd 04-01-2024, on review during APRIL 2024; Comments published 05/01/2024.
- 2nd Submittal rcvd 06-04-2024, on review during JUNE 2024; Comments published 06/21/2024.
- 3rd Submittal rcvd 07-01-2024, on review during JULY 2024; Comments published 07/17/2024.
- TRC Review is complete; Wake County SEC-121765-2024 approval required by/before signatures.
- 2024-10-02 - Wake County Permit SEC-121765-2024 DISAPPROVAL Letter issued.
CID-24-03 - UNDER REVIEW - Construction Infrastructure Drawings for Lot 8, for mass grading and erosion control purposes. This application is submitted/reviewed/Approved under the Land Development Ordinance (LDO).
- 1st Submittal rcvd 04-01-2024, on review during APRIL 2024; Comments published 05/01/2024.
- 2nd Submittal rcvd 06-04-2024, on review during JUNE 2024; Comments published 06/21/2024.
- 3rd Submittal rcvd 07-01-2024, on review during JULY 2024; Comments published 07/17/2024.
- TRC Review is complete; Wake County SEC-121766-2024 approval required by/before signatures.
SDP-24-03 - Chase Bank Wallbrook - UNDER REVIEW - Site Development of (currently proposed Lot 5A per PSP-24-01 and FSP-24-13) for a commercial bank office.
- 1st Submittal rcvd 04-29-2024, on review during MAY 2024; Comments published on 06/09/2024.
- 2nd Submittal rcvd 07-01-2024, on review during JULY 2024; Comments published on 08/01/2024.
FSP-24-13 - Wallbrook Lots 5A,5B,5C,5D - UNDER REVIEW - Final Subdivision Plat to divide 6.48 acres, being PIN 1758563963 (Lot 5 of PR 21-04 Revised) into 4 non-residential lots.
- 1st Submittal rcvd 2024-09-03; on TRC Staff review during SEPTEMBER 2024; comments published on 2024-09-23.
- 2nd Submittal rcvd 2024-10-03; on TRC Staff review during OCTOBER 2024; comments published on 2024-10-15.
- Street Light Pole INVOICE 2875 for 6 poles issued 3-21-2025.
SDP-24-07 - Fifth/Third Bank Wallbrook - UNDER REVIEW - Site Development of (Lot 3 per FSP-24-09, BM2024/Pg1692-1693) for a commercial bank office. V1 Plans are 21 sheets.
- 1st Submittal rcvd 08-29-2024, on review during SEPTEMBER 2024; Comments published on 2024/10/04. Plan set is 21 shts.
- 2nd Submittal rcvd 10-30-2024, on review during NOVEMBER 2024; Comments published on 2024/12/06. Plan set is 28 shts.
- 3rd Submittal rcvd 01-13-2025, on review during FEBRUARY 2025; Comments published on 2025/02/23 . Plan set is 31 shts.
- 4th Submittal rcvd 03-04-2025, on review during MARCH 2025; Comments published on 2025/03/22 . Plan set is 28 shts.
- Approved by Town on 2025-03-22 / awaiting signature approval by Wake Co and CORPUD.
- Wake Co. APPROVAL letter dated 2025-03-28 for SEC-141990-2025/SWF-141991-2025 issued.
- Pre-Construction/Permitting meeting to occur upon scheduling by Applicant.
CD 22-04 REVISION - Wallbrook Townhome Construction Drawings - UNDER REVIEW - Revision to the previously approved CD 22-04 for the infrastructure related to this townhome subdivision, pursuant to SP 21-02 (Preliminary subdivision plat for 140 townhome lots etc).
- V1 Submittal rcvd 2024-09-03; on TRC Staff review during SEPTEMBER 2024; comments published 2024-09-18.
- The V1 submittal consists of 14 Sheets, being: C.00 (Project Notes); C2.00 (Overall Site Plan); C2.01 (Site PLan-Area A); C2.02 (Site Plan-Area B); C9.A1 (Stormwater Control Measure "A" Plan View); C9.A2 (Stormwater Control Measure "A" Details); C9.A3 (Stormwater Control Measure "A" Details); C9.A4 (Stormwater Control Measure "A" Landscape Plan); C9.B1 (Stormwater Control Measure "B" Plan View); C9.B2 (Stormwater Control Measure "B" Details); C9.B3 (Stormwater Control Measure "B" Details); C9.B4 (Stormwater Control Measure "B" Landscape Plan); L5.00 (Overall Code Landscape Plan); L5.01 (Enlarged Code Landscape Plan).
- V2 Submittal rcvd 2025-01-15, consisting of a Revision to Sheets C2.01 and C2.02 (Site Plan Areas A and B)
- Fully signed/approved Plan with the following Approval dates - Town 2024-09-18 / Wake Co 2024-10-25 / City of Raleigh 2024-11-13. Plan is in two parts - Part 1 is 30 Sheets, Cover to C-6.06 / Part 2 is 31 Sheets, C-6.07 to SL2.2 .
SDP-25-01/CID-24-03 - UNDER REVIEW - Site Development Plan of Lot 8 (BM2023/Pg1600-1602) of the Wallbrook commercial development for a Hall of Fame Car Wash on a portion of the lot. This applicatipon absorbs and collapses CID-24-03 into it, encompassing the mass grading of the entire Lot 8.
- 1st Submittal rcvd 2025-01-02; on TRC Staff review during JANUARY 2025; comments published on 2025-02-10. Plan set is 18 sheets
- 2nd Submittal rcvd 2025-03-03; on TRC Staff review during MARCH 2025; comments published on 2025-03-25. Plan set is 22 sheets.
- 3rd Submittal rcvd 2025-04-01; on TRC Staff review during APRIL 2025; comments to be published by/on 2025-04-21. Plan set is 22 sheets.
FSP-25-06 - UNDER REVIEW - Final Subdivision Plat to record 6.95 acres, being lots 12, 13, 14 from Revised PR 21-04; this land is presently recorded in BM1996/Pg1582.
- 1st Submittal rcvd 2025-02-06; on TRC Staff review during FEBRUARY 2025; comments published 2025-03-10.
- 2nd Submittal rcvd 2025-04-01; on TRC Staff review during APRIL 2025; comments to be published by/on 2025-05-05.
FSP-25-10 - UNDER REVIEW - Final Subdivision Plat to record 1.25 acres, a portion of Lot 6 from Revised PR 21-04, for the development of 24 Single-family Attached (SFA, Townhome) lot, being Lots 80-103; 2,700 linear feet of 50' public right-of-way (Lettie Ln, Wallstone Way) and 680 linear feet of 60' public right-of-way (Wall Creek Drive).
- 1st Submittal rcvd 2025-02-27; on TRC Staff review during MARCH 2025; comments published on 2025-04-05.
FSP-25-11 - UNDER REVIEW - Final Subdivision Plat to subdivide Lot 8 from Revised PR 21-04, a 5.35 ac. lot being PIN 1758671871, into two (2) lots - 8A and 8B - for future non-residential development.
- 1st Submittal rcvd 2025-03-03; on TRC Staff review during MARCH 2025; comments published on 2025-04-05.
Documents
CID-23-04 - Wallbrook/Va Water Dr Ext. - V1
- V1 - Application for Construction Infrastructure Drawings
- V1 - Property Owner Consent Form
- V1 - Construction Drawing plan set dated 05-01-2023
- V1 - Comments SUMMARY - READ FIRST
- V1 - Comments-PLANNING Mark-up
- V1 - Comments-ENGINEERING - Mark-ups on Application
- V1 - Comments-ENGINEERING - CD Plan mark-ups
- V1 - Comments-COR-PUD - CD Plan Sht C.01 Mark-up
CID-23-04 - Wallbrook/Va Water Dr Ext. - V2
- V2 - Response to V1 PLANNING Mark-up sht C1.0
- V2 - Response to V1 Engineering CID Mark-ups
- V2 - Response to V1 Engineering Application Mark-ups
- V2 - Response to V1 COR-PUD Mark-ups
- V2 - CID Plan set revised dated 06-01-2023
- V2 - Stormwater Pipe network memo
- V2 - Comments-SUMMARY - READ FIRST
- V2 - Comments-ENGINEERING_Memo dated 6-22-23
- V2 - Comments-ENGINEERING_Mark-ups
- V2 - Comments_COR-PUD mark-up Sht C3.0
CID-23-04 - Wallbrook/Va Water Dr Ext. - V3
CID-23-04 - Wallbrook/Va Water Dr Ext. - V4
CID-23-04 - Wallbrook/Va Water Dr Ext. - V5
SDP-23-04 - 7-Eleven Site Development Plan - V1
- V1 - Application for Site Development Plan
- V1 - Property Owner Consent Form
- V1 - Site Development Plan set-dated 05-01-2023
- V1 - COMMENTS SUMMARY - READ FIRST
- V1 - Comments-PLANNING Memo dated 5-18-23
- V1 - Comments-PLANNING - Mark-ups of SDP plans
- V1 -Comments-ENGINEERING - mark-ups of SDP plans
- V1 - Comments-COR-PUD - mark-up of Sht C3.0 only
SDP-23-04 - 7-Eleven Site Development Plan - V2
- V2 - Response to V1 PLANNING Mark-up Comments
- V2 - Response to V1 ENGINEERING Mark-up Comments
- V2 - Response to V1 COR-PUD mark-up Comments
- V2 - Site Dev Plan rev dated 06-01-2023
- V2 - Stormwater Pipe Network Memo
- V2 - Comments SUMMARY - READ FIRST
- V2 - Comments PLANNING_mark-ups_
- V2 -Comments ENGINEERING Memo dated 6-22-23
- V2 -Comments ENGINEERING_Mark-ups_Sht C1.0 & C2.0
SDP-23-04 - 7-Eleven Site Development Plan - V3
- V3 - Response to V2 Planning mark-ups
- V3 - Response to V2 Planning ELEVATIONS mark-ups
- V3 - Response to V2 ENGINEERing mark-ups
- V3 - Pipe Network Memo dated 3-1-2024
- V3 - Revised Plan Set March 2024
- V3 - Comments- SUMMARY - READ FIRST
- V3 - Comments-PLANNING Mark-up
- V3 - Comments- Wake Co. SEC/SWF Permit Disapproval letter 4/5/24
SDP-23-04 - 7-Eleven Site Development Plan - V4
SDP-23-04 - 7-Eleven Site Development Plan - V5
CID-24-02 - Wallbrook Lot 7 Mass Grading - V1
CID-24-02 - Wallbrook Lot 7 Mass Grading - V2
CID-24-02 - Wallbrook Lot 7 Mass Grading - V3
CID-24-02 - Lot 7 - Wake Co Permit Disapproval 10-02-2024
CID-24-03 - Wallbrook Lot 8 Mass Grading -V1
CID-24-03 - Wallbrook Lot 8 Mass Grading -V2
CID-24-03 - Wallbrook Lot 8 Mass Grading -V3
SDP-24-03 - Wallbrook Lot 5A Chase Bank - V1
- V1 - Application
- V1 - Property Owner Consent form
- V1 - Completed SDP Checklist for review
- V1-Architectural Plans separate
- V1 - SDP Plan set
- V1 - Comments SUMMARY - READ FIRST
- V1 - Comments-PLANNING - memo
- V1 - Comments-PLANNING - Arch Plan mark-ups
- V1 - Comments-PLANNING - Plan set mark-ups
- V1 - Comments-ENGINEERING - memo
- V1 - Comments-ENGINEERING - Plan mark-ups
SDP-24-03 - Wallbrook Lot 5A Chase Bank - V2
- V2 - Response to V1 ENGINEERING Comments
- V2 - Response to V1 Architectural Comments
- V2 - Entitlement Package (?) - inc Architectural Elevations
- V2 - Stormwater and E&SC Report
- V2 - Revised SDP plan set 16 shts dated 7-1-2024
- V2 - Comments SUMMARY - READ FIRST
- V2 - Comments - PLANNING Memo 07-29-2024
- V2 - Comments - ENGINEERING Memo 7-29-24
- V2 - Comments - Plans ENGINEERING Mark-ups
- V2 - Comments - ENGINEERING Stormwater/Erosion Control Rpt Mark-ups
- V2 - Comments - CORPUD Mark-ups Sht C5.01
FSP-24-12 - Wallbrook Lot 11 - V1
FSP-24-12 - Wallbrook Lot 11 - V2
FSP-24-13 - Wallbrook Lots 5A-D - V1
FSP-24-13 - Wallbrook Lots 5A-D - V2
CD 22-04 REVISION - Wallbrook Townhomes - V1
CD 22-04 REVISION - Wallbrook Townhomes - V2 (actually Revision 2)
SDP-25-01(+CID-24-03) - Wallbrook Lot 8/HOF Car Wash - V1
FSP-25-06 - MBW Tract Lots 12,13,14 - V1
FSP-25-10 - Wallbrook Townhomes Lot 6 - Phase 2 - V1
FSP-25-11 - Wallbrook Lot 8 Resubdivision - V1
SDP-25-01(+CID-24-03) - Wallbrook Lot 8/HOF Car Wash - V2
- V2 - Response to V1 Comment SUMMARY
- V2 - Response to V1 Engineering Markups
- V2 - FIre Truck access exhibit
- V2 - Trash Truck access exhibit
- V2 - Application / Prop Owner consent
- V2 - Checklist
- V2 - Pipe Network Memo
- V2 - Revised SDP plan set dated 3-3-25
- V2 - Comments SUMMARY-READ FIRST
- V2 - Comments-CORPUD Mark-ups
- V2 - Comments-Wake Co Disapproval of SEC-121766-2024_10-02-2024