- March 2021ApplicationMar 1, 2021
- Summer 2021Town Board Public HearingJul 8, 2021
- Summer 2021Town Board Public Hearing for Plan Amendment
- October 2022Final ApprovalOct 6, 2022
Cobblestone Village - new Town Center mixed-use development at NW corner of Young and Main Street, per Economic Development Agreement (EDA) with the Town.
SP 21-01 - Site plan / Construction Drawings for Cobblestone Crossing. This development entails a maximum of 188 multifamily dwelling units and a maximum of 53,384 SF of retail/flex/commercial space, 0.44 acre/18,976 SF of Event space, 1.92 acres of overall Open Space Area, and 468 overall parking spaces.
- 1st Submittal - Plans dated 02/25/2021 and consist of 28 Sheets. TRC-Staff Comments dated 05/19/2021.
- 2nd Submittal - Plans dated 05/28/2021 and consist of 21 Sheets. No record of TRC-Staff Comments.
- 3rd Submittal - Plans dated 06/23/2021 and consist of 31 Sheets. No record of TRC-Staff Comments.
- Town Board meeting 07/08/2021 - Approved Site Plan set dated 06-23-2021.
- 4th Submittal - Plans dated 08/30/2021. Consists of 1 Sheet (C1.1). No record of TRC-Staff Comments.
- Town Board meeting 10/05/2021 - Approved Amendment to Site Plan, new Sheet 1 dated 09/29/2021.
- 5th Submittal - Plans dated 10/19/2021. Consists of 21 Sheets. No record of TRC-Staff Comments.
- 6th Submittal - Plans dated 12/02/2021. Consists of 21 Sheets. TRC-Staff Comments dated mid-December 2021.
- 7th Submittal - Plans dated 03/20/2022. Consists of 21 Sheets. TRC-Staff Comments issued 04/11/2022.
- 8th Submittal received 04-22-2022, on TRC/STAFF review on 04/22/2022. Comments published on 04/28/2022.
- 9th Submittal received 05-17-2022, on TRC/STAFF review on 05/17/2022. Comments published on 05/23/2022.
- 10th Submittal received 05-27-22, TRC/Staff reviewed between 05/27/22 and 05/31/22, Comments published 05/31/2022.
- 11th Submittal received 06-02-2022.
- FINAL Approval per Planning Director signature on/of 10/06/2022.
- Revision 1st Submittal - rcvd 04-14-2023 / Comments issued 04-19-2023. V1 proposed to remove the Town of Rolesville Community Building, Veterans Memorial, and clock tower from the development and replace those features with a new Residential Building #4 [32 multi-family dwelling units] and other amenities and site revisions. With this revision, the proposed number of multi-family dwelling units increases from 176 is 196 and the non-residential (retail/commercial) square footage decreased from 65,730 to 49,830 SF. The number of buildings decreased from 8 to 7; original Building 4 identified as a 15,900 SF Municipal is now Building 4 as a 42,816 SF Apartment; original Building 8, a 17,453 SF Apartment, has been removed entirely. The overall provided parking has increased from 468 to 494 spaces with these changes. Event Space and Open Space remain unchanged.
- Revision 2nd Submittal - rcvd 09-01-2023 / Comments issued 10-08-2023. V2 proposed removing Town of Rolesville Community Building, Veterans Memorial, and clock tower; multi-family dwelling units decreased from 196 to 188; the non-residential (retail/commercial) square footage increases from 49,830 to 53,384 SF; the number of buildings now increase from 7 to 8 (Building #8 is not returned in the same location it was originally approved in, but increases from a 12 multi-family unit/3-story to a 24 multi-family unit/3-story structure; Building 5 increases from 3,647 SF to 5,970 SF; Building 4 changes from a 32 multi-family unit/4-story to a 10,420 SF/1-story commercial building. The overall provided parking has Decreased from 494 to 468 spaces with these changes.
- Revision 3rd Submittal - rcvd 11-01-2023 / comments issued 11-21-2023. V3 maintains proposed total multifamily dwelling units at 188, the non-residential square footage at 53,384 SF, within 8 total buildings. The overall Required parking is 537; after Reductions, required is 457; the Provided parking is 468 spaces.
- Revision 4th Submittal - rcvd 12-08-23 / comments issued 12-19-2023.
*On 01-04-2024, the Town Board of Commissioners conducted a Quasi-Judicial Evidentiary Hearing for Agenda Item 10.b., and voted 4-0 (1 absent) on a Motion to Approve.
- Revision 5th Submittal - rcvd 01-30-2024 / comments issued 02-05-2024. This was submitted as an intended "Signature set" of documents for the Revised SP 21-01; this Version maintains 188 multifamily dwelling units, 53,384 SF of non-residential space, required Parking of 537 spaces minus Reductions = 457 required, proposed 468 spaces.
*STATUS - Wake County Watershed Management - Disapproval Letter dated 02-19-2024 for SEC-055248-2021/SWF-055250-2021.
- Revision 6th Submittal - rcvd 02-29-2024 / Comments issued 03-01-2024
- Revision 7th Submittal - rcvd 04-04-2024 / Comments issued 04-18-2024
- Revision 8th Submittal - rcvd 04-19-2024 - FInal Review Approval provided 04-23-2024.
FSP-23-17 - RECORDED 09-04-2024 as BM2024/Pg1785-1786 -- Final Subdivision Plat to record three (3) New Easements on PIN 1769011435, being Lot 1 of Cobblestone Crossing of Rolesville LLC, BM2021/Pg1208. Three (3) submittals reviewed by TRC between September 2023 and July/August 2024.
Updates
Evidentiary Quasi-judicial Hearing on Revision to SP 21-01
On January 4, 2024, at 7:00 PM at Town Hall (502 Southtown Circle, Rolesville, NC 27571), an Evidentiary Quasi-judicial hearing will be conducted by the Town Board of Commissioners to consider revisions made to the previously approved Site Plan SP 21-01 for Cobblestone Crossing (Village). See Item 10.b. in the Agenda for this meeting found here: https://www.rolesvillenc.gov/agendas-minutes .
Evidentiary Hearing on Site Plan
A public hearing was held regarding the Cobblestone Site Plan on July 8. The Town Board voted to approve the site plan with conditions.
Documents
SP 21-01 Cobblestone 1st Submittal - Feb 25 2021
SP 21-01 - Cobblestone 2nd Submittal - May 28, 2021
SP 21-01 - Cobblestone 3rd Submittal - June 23, 2021
SP 21-01 - Cobblestone - Request Town Board Public Hearing at Town Board - June 1, 2021
SP 21-01 - Cobblestone - Town Board Mtg - July 8, 2021
SP 21-01 - Cobblestone 4th Submittal - Aug 30 2021
SP 21-01 - Cobblestone - Amendment - Town Board Mtg - Oct 05, 2021
SP 21-01 - Cobblestone 5th Submittal - October 19, 2021
SP 21-01 - Cobblestone 6th Submittal - Dec 2, 2021
SP 21-01 - Cobblestone 7th Submittal - March 10, 2022
- V7 - Cobblestone Site Plan/Construction Dwg Plans - version March 10, 2022
- V7 - Cobblestone Comment Summary (Read first)
- V7 - PLANNING Comment Memo
- V7 - PLANNING Comment Mark-ups
- V7 - ENGINEERING Comment Memo
- V7 - ENGINEERING Comment Mark-ups
- V7 - NCDOT Comment Mark-ups (Page 3)
- V7 - CoR-PUD Comment Mark-ups
SP 21-01 - Cobblestone - 8th Submittal - April 21, 2022
- V8 - Written response to the V7 comments (Planning & Engineering only)
- V8 - Site Plan/Constr Dwgs revised dated 4-20-22 (left side bar)
- V8 - Comment SUMMARY - READ FIRST
- V8 - Comments - Greenways
- V8 - Comments-Planning-WithersRavenel - Memo dated 4-26-22
- V8 - Comments-Planning-WithersRavenel - Plan Mark-ups
- V8 - Comments-Engineering - Memo dated 4-26-22
- V8 - Comments-Engineering - Plan mark-ups
- V8 - Comments-NCDOT - Plan mark-ups/LAPP exhibits
- V8 - Comments-COR-PUD - Email / mark-up
SP 21-01 - Cobblestone - 9th Submittal - May 17, 2022
- V9_Respone to V8 Staff Comments
- V9_Site Plan/Construction Drawings
- V9_Stormwater Calculations
- V9_Comments SUMMARY - READ FIRST
- V9 - Comments_PLANNING (WR & STAFF) - Memo Rev dated 5-23-22
- V9 - Comments_ENGINEERING_Mark-up Sheet C-1.1 Site Plan
- V9 - Comments_ENGINEERING_Mark-up Sheet C-3.1 Grading
- V9 - Comments_ENGINEERING_Mark-up SW Drainage Area Calcs
- V9 - Comments_DOT_Mark-ups Entire Plan set
SP 21-01 - Cobblestone - 10th Submittal - May 27, 2022
SP 21-01 - Cobblestone - 11th Submittal - June 2, 2022
SP 21-01 Cobblestone Village Site Plan/Construction Drawings - Signature Set
SP 21-01 REVISION - Cobblestone V1
- REVISION Application signed 3-1-2023
- REVISION Cobblestone SP/CD Plan set
- REVISION Cobblestone - Building 4 Elevation drawings
- V1 - Comments SUMMARY - READ FIRST
- REV V1 - Comments- ENGINEERING - Memo dated 4-14-23
- REV V1 - Comments- ENGINEERING - Mark-up Sht C3.1 Grading
- REV V1 - Comments- ENGINEERING - Mark-up Sht -Lighting
- REV V1 - Comments- ENGINEERING - Mark-up Sht C1.1 Site Plan
- REV V1 - Comments- ENGINEERING - Mark-up Sht C2.1 Utility
- REV V1 - Comments- ENGINEERING - Mark-up Sht C3.4 Eros Cntrl
- REV V1 - Comments- ENGINEERING - Mark-up Sht C3.8 Drainage Tables
- REV V1 - Comments- ENGINEERING - Mark-up-DA Stormwater Calcs
SP 21-01 REVISION - Cobblestone V2
SP 21-01 REVISION - Cobblestone V3
- REV V3 - Response to V2 Comments
- REV V3 - Fire Truck Exhibit
- REV V3 - 10-Yr HGL Charts & Profiles
- REV V3 - Revised Site/Construction Plan set (rev dated 10-16-23)
- REV V3-Comments-SUMMARY - READ FIRST
- REV V3-Comments-ENGINEERING Memo dated 11-15-23
- REV V3-Comments-ENGINEERING Plan mark-ups
- REV V3-Comments-ENGINEERING 10-Yr HGL Mark-ups
- REV V3-Comments-CORPUD - Sht C2.1 Mark-ups
- REV V3 - Cobblestone Parking Study-Rvsd 06-29-2021